Clients

  • First Prime Ltd
  • Maersk Line Ltd (sub contractor)
  • Retail Outlet for Oando, Conoil, Total
  • Tower Aluminum Plc
  • Mtn Station Sites (sub contractor)
  • Federal Airport Authority Nigeria (sub contractor)
  • Femadec
  • Central Bank Of Nigeria (CBN)

Projects Done

  1. Abikes Court: Click here to download brochure
  2. Construction of Home Economics / Classroom Block at Queens College Lagos
  3. Construction of 120 units of Basic Infrastructures in Edo and Ondo States
  4. Construction of 84 units of Basic infrastructures in Bayelsa State
  5. Design, development and construction of the 13.02 MW First Power Limited Ijora Independent Power Plant Project
  6. Design, development and deployment of the 15 MW Standard Metallurgical Company Shagamu Independent Power Plant Project
  7. Design, development and construction of the 16.5 MW Shoreline Power Shagamu Independent Power Plant Project
  8. Design, development and deployment of the 30 MW ODSG Ore Independent Power Plant Project.